It was very kind of the School of Dramatic Arts to let us pull platforms from their stock. I certainly couldn’t have built all these platforms in the week I had. I didn’t feel the need to produce many working drawing for this show since I was the only carpenter working on it. I usually took measurements off of the designer’s drafting and then cut them a few seconds later.

For the details at the the top of the book shelves I purchased foam wall decorations. I glued them to plywood backings with extra space on the bottom to attach them to the top of the bookshelves.


 
Return to Previous page
back to top